The Thrawne gas field was discovered in 1982. Equity in the licence was acquired in 2001.

The Thrawne NUI platform was installed in September 2006 with 3 production wells drilled resulting in first gas production in December 2007. Gas is exported via a 37km pipeline to the Perenco operated Indefatigable

Thrawne has produced 42bcf of gas up to end 2017. There are estimated remaining reserves of 3.5bcf.